965 Capstone Drive

cos
  • 5-Floor 60,520 SF Technology Building
  • Lab, Office, Light Manufacturing
  • Flexible Systems / Rapid Customization
  • Multi-Tenant Gross Lease Structure
  • High Speed Internet Access
  • Close-in Parking
  • Variable Height Loading Deck
  • Secure Intra-Building Communications

Download Profile

  • 965 Capstone Drive (1.8MB)
    The Central Operational Support Building at 965 Capstone Drive was constructed in 1988 for use as an office/laboratory facility.